REALIZOVANÉ STRECHY S NÍZKOU KONŠTRUKCIOU KROVU
A POZINKOVANOU FALCOVANOU KRYTINOU V MALACKÁCH A STUPAVE
Investor | Bytový dom | Miesto | Výmera | Rok realizácie | |
1. | TERMMING, a.s. Malacky | Záhoracká 1934 | Malacky | 820 m2 | 2008 |
2. | TERMMING, a.s. Malacky | Ľ. Fulu 1640 / 1, 3 | Malacky | 463 m2 | 2009 |
3. | TERMMING, a.s. Malacky | Skuteckého 1635 | Malacky | 1136 m2 | 2010 |
4. | TERMMING, a.s. Malacky | M. Rázusa 2780 | Malacky | 463 m2 | 2010 |
5. | TERMMING, a.s. Malacky | M. Rázusa 2779/21,23 | Malacky | 463 m2 | 2010 |
6. | TERMMING, a.s. Malacky | Záhoracka 5 | Malacky | 365 m2 | 2011 |
7. | TERMMING, a.s. Malacky | Bernolákova 2424/10-16 | Malacky | 771 m2 | 2012 |
8. | TERMMING, a.s. Malacky | Mierové námestie 2545 | Malacky | 550 m2 | 2012 |
9. | SBD Pezinok | Záhorácka 1937/73-75-77 | Malacky | 644 m2 | 2019 |
STUPAVA | |||||
1. | SBDO Pezinok | Ružová 8-24 | Stupava | 1410 m2 | 2011 |